+61 3 9058 4732 accessoffercrestau@gmail.com 242 Exhibition Street, Melbourne VIC 3000, Australia

Bathroom renovations

Bathroom Renovation and Waterproofing

Waterproofing, screeding, tiling and fit-off handled by one crew from start to finish. We demolish the old bathroom, rebuild the wet area to AS 3740, and hand back a room you can shower in that same evening. Three to four weeks on site is typical for a standard Melbourne bathroom.

Wet areas that stay dry for twenty years

The membrane is the part you never see, so we photograph it

Nearly every failed bathroom we pull apart failed at the waterproofing, not the tiles. Water gets behind the screed, the timber floor swells, and the repair bill runs into five figures before anyone notices the smell.

We strip the room back to the studs and the slab, replace any rotten framing, then spend a full day on the membrane before a single tile is laid. Every coat is photographed and the compliance certificate goes into your file. Fall to the floor waste is checked with a laser level rather than a spirit level, because two millimetres over a metre is the difference between a dry slab and a damp one after a ten minute shower.

  • 610 Bathrooms completed across Melbourne
  • 0.8% Call-back rate for water leaks after handover
  • 21 days Median build time for a four square metre room
  • $21,750 Median cost for a full strip and rebuild
Renovated bathroom with walk-in shower and floor-to-ceiling tiling
Our old shower had been leaking into the hallway for years and nobody could find it. They pulled the whole room out, found the split pipe and rebuilt it properly. The waterproofing certificate arrived in the post a week later, which none of the other quotes even mentioned.
Daniel Okafor
Daniel Okafor Homeowner, Reservoir
Experience

Why we photograph the membrane

Waterproofing disappears the moment the tiles go down, so we document it and hand you a compliance certificate instead of a verbal assurance.

  • Licensed waterproofer on staff, not a subcontracted crew booked in at the last minute.
  • Wet area set-down and fall checked against a laser and photographed before screeding begins.
  • Full-height tiling to the shower, with the floor and wall junction sealed with epoxy grout.
  • Certificate of compliance emailed within two working days of the inspection.
Pricing

Three ways to renovate a bathroom

Pricing assumes a room up to five square metres in a single-storey home. Double-storey access, asbestos removal and structural changes are quoted separately.

Cosmetic refresh

$13,400 / project

  • New tapware, mirror cabinet and vanity on the existing plumbing points
  • Retiling of walls and floor over the current waterproofing
  • New exhaust fan ducted through to the roof space
  • Re-grouting and resealing of the existing shower base
Price my refresh
Rebuild with layout change

$41,200 / project

  • Everything in the full rebuild, plus moving the toilet and vanity points
  • Wet room conversion with a freestanding bath and open shower
  • Underfloor heating mat with a programmable thermostat
  • Skylight or frosted highlight window supplied and installed
Discuss a layout change
Our Process

Six stages from demolition to handover

The order matters more than the speed. Removing the floor waste before the frame is straight is how bathrooms end up failing.

  1. Site inspectionWe check the subfloor, look for asbestos sheeting in older homes and confirm whether the existing floor waste can stay in place.
  2. Scope and selectionsYou choose tiles, tapware and sanitaryware at a showroom appointment, and the price is locked against those exact items.
  3. Demolition and rough-inThe room comes out in a day behind dust barriers, then new pipework and electrical are run and pressure tested.
  4. Sheeting and screedTile underlay goes down, the shower base is formed to fall toward the waste, and the screed cures for forty-eight hours.
  5. Waterproofing and flood testTwo coats of membrane are applied and photographed, then the floor is flooded and left overnight to prove it drains cleanly.
  6. Tiling, fit-off and handoverWalls and floors are tiled and epoxy grouted, screens and tapware go on, and we inspect the finished room with you.
Gallery

Bathrooms handed over this year

A sample of rooms finished in Melbourne's inner and middle suburbs, along with the brief each one started from.

Bathroom with freestanding bath and brass floor tap in Fitzroy North

Fitzroy North terrace

A narrow 2.1 metre room opened up by moving the vanity to the long wall and dropping the shower to a single fixed screen.

Small ensuite with wall-hung vanity and backlit mirror

Kew ensuite

The wall-hung vanity floats clear of the floor, and a backlit mirror adds light without a pendant the ceiling could not take.

Family bathroom with niche shelving and grey porcelain tiling

Point Cook family bathroom

Three kids share this room, so we built two recessed niches and specified arctic porcelain that hides water spots.

Accessible bathroom with grab rails and level shower entry

Coburg accessible wet room

No hob and no step, a twelve hundred millimetre turning circle, and grab rails fixed to noggins we set at framing stage.

Powder room with terrazzo vanity and vertical subway tiles

Carlton powder room

A 1.6 metre space turned into a powder room with a terrazzo vanity and tiles laid vertically to make the ceiling feel higher.

Master bathroom with double shower and skylight in Doncaster

Doncaster master suite

Two shower heads on one mixer, a skylight over the wet zone, and underfloor heating run off the existing circuit.

FAQ

What people ask before we start

Usually not, as long as the room stays in the same position and the plumbing points do not move outside the footprint. Moving a floor waste or adding a second bathroom does trigger a building permit, and we lodge that application for you.

Around twelve days for a full rebuild. The screed has to cure, then the membrane needs a dry day before flood testing, and that stretch cannot be shortened. We give you the exact dates on the day we start.

Often yes. We photograph the existing tiles and take a sample to our supplier to match the range. If the original has been discontinued we look at a close replacement and lay it in a different room so the mismatch is not visible side by side.

We plug the floor waste, fill the shower base with water and leave it for at least twenty-four hours. If the level has dropped or the slab below shows damp, the membrane comes off and that stage starts again.

Older Melbourne homes often have asbestos sheeting behind the tiles. We arrange a licensed removalist, get air monitoring clearance and factor the cost into the quote before demolition starts, never as a surprise variation.

Bookings normally open three to five weeks out because each job runs through to handover before the next one begins. We will hold a provisional date while you finalise selections so the slot is not lost.

Get in touch

Book a bathroom assessment

Tell us the suburb, how many bathrooms are involved and whether there is a leak you have already spotted. We book inspections for weekday mornings and Saturday mornings.

  • Ring the office on +61 3 9058 4732 and ask for the wet area team.
  • Send photos of the existing bathroom to accessoffercrestau@gmail.com and we will reply with an initial read.
  • We work out of 242 Exhibition Street, Melbourne VIC 3000, and cover everything inside a thirty kilometre radius.

Photos help more than measurements at this stage. Send them with this form and we can often give a range before the visit.